Announcement of Ministry of Construction of the People's Republic of China
Forward
1 General Provisions
2 Basic Provisions
3 Equipment Foundation,Anchor Bolts and Padding Plate
3.1 General Provisions
3.2 Equipment Foundation
3.3 Anchor Bolt
3.4 Padding Plate
4 Mobilization of Equipments and Materials
4.1 General Provisions
4.2 Equipments and Elements
4.3 Raw Materials
5 Process Structural Steelwork
5.1 General Provisions
5.2 Welding
5.3 Connection of High-strength Bolts
5.4 Fabrication of Frame,Corridors,Truss
5.5 Fabrication of Large-diameter Coil-welded Steel Pipe
5.6 Fabrication of Shell
5.7 Installation of Frame
5.8 Installation of Corridors,Truss
5.9 Installation of Shell
5.10 Installation of Large-diameter coil-welded steel pipe
5.11 Painting Works for Process Steel Structure
6 Installation Engineering of Blast Furnace Body Equipment
6.1 General Provisions
6.2 Furnace Body Cooling Equipment
6.3 Tuyere Device
6.4 Slag hole Device and taphole sleeve
6.5 Gas Sampling Device
6.6 Commissioning of Gas Sampling Device
6.7 Throat Steel Brick
6.8 Furnace Top Guard Shield
7 Installation Engineering of Blast Furnace Bell-less Top Equipment
7.1 General Provisions
7.2 Transmission Gear Box with Distribution Chute
7.3 Bellows
7.4 Valve Box
7.5 Charging Bucket
7.6 Receiving Hopper
7.7 Commissioning of Bell-less Charging Equipment
7.8 Vertical Detecting Device
7.9 Commissioning of Vertical Detecting Device
7.10 Blow-off valve,Equalizer valve on top
7.11 Commissioning of Blow-off Valve,Equalizing Valve
7.12 Top Ignition Device
7.13 Commissioning of Top Ignition Device
7.14 Throat spray device
7.15 Throat Temperature Measuring Device
8 Installation Engineering of Feeding Equipment
8.1 General Provisions
8.2 Electric Belt Discharging Car
8.3 Commissioning of Electric Belt Discharging Car
8.4 Weighing Hopper
8.5 Commissioning of Weighing Hopper
8.6 Coke Cutter
8.7 Commissioning of Coke Cutter
9 Installation Engineering of Charging Equipment
9.1 General Provisions
9.2 Skip Charging Equipment
9.3 Commissioning of Skip Charging Equipment
9.4 Belt Charging Equipment
9.5 Commissioning of Belt Charging Equipment
10 Installation Engineering of Tuyere Platform and Cast House Equipment
10.1 General Provisions
10.2 Hydraulic Clay Gun
10.3 Commissioning of Hydraulic Clay Gun
10.4 Taphole Machine
10.5 Commissioning of Taphole Machine
10.6 Slag Stopper
10.7 Commissioning of Slag Stopper
10.8 Slag,Iron Chute and Gate
10.9 Swinging Iron Nozzle
10.10 Commissioning of Swinging Iron Nozzle
10.11 Main Chute Cover Carriage
10.12 Commissioning of Main Chute Cover Carriage
11 Installation Engineering of Hot-blast stove Equipment
11.1 General Provisions
11.2 Snout and Supports
11.3 Sleeve-type Burner and Combustion Air Fan
11.4 Commissioning of Combustion Air Fan
11.5 Valves of Hot-blast Stove
11.6 Commissioning of Hot-blast Stove Valve
12 Installation Engineering of Blast Furnace Air-blowing Equipment
12.1 General Provisions
12.2 Axial Blower
12.3 Commissioning of Axial Blower
12.4 Air Filter
12.5 Overall No-load Commissioning of Air Filter
12.6 Dehumidifier
12.7 Valve
12.8 Commissioning of Valve
13 Installation Engineering of Gas Purification Equipment
13.1 General Provisions
13.2 Gas Shut-Off Valves of Dust Remover
13.3 Commissioning of Gas Shut-off Valves of Dust Remover
13.4 Ash Valve of Dust Collector and Gas Ash Mixer