9.2 Skip Charging Equipment

General Items

9.2.1 The contact face of combined pedestal for windlass shall meet the requirements in the design documents.A 0.05mm feeler gauge shall be used and the inserting depth shall be less than 30mm when not specified.

Check quantity:4 points on contact face of combined pedestal for windlass.

Check method:check with a feeler gauge or take visual check.

9.2.2 The allowable installation deviation of charging car and its windlass,rope sheave shall meet the requirements in Table 9.2.2.

Check quantity:full check.

Check method:see Table 9.2.2.

Table 9.2.2 Allowable installation deviation of charging car,windlass and rope sheave(mm)

img

Table 9.2.2(Continued)

img