5.5 Installation of Accumulator
General Items
5.5.1 The allowable deviation for installation of accumulator shall comply with the requirements in Table 5.5.1.
Quantity to be checked:100%.
Inspection method:See Table 5.5.1.
Table 5.5.1 Allowable deviation for installation of accumulator